How long does it take EcoCrete to dry and cure?
The EcoCrete process itself has 4 steps: 1 - One to two coats of bonding primer with each coat
taking 20 min to dry. 2- The overlay application which takes 8 hours to dry and 28 days to cure. 3- Oxidization or coloring process which reacts in 3 hours. 4 - Finally, the sealer which takes 30 min to 4 hours to dry per coat. The first two steps can be done the first day and the last two steps can be done the next day. (Estimates above do not include prepping surfaces. Also size of area, weather, unforeseen occurrences and unstable conditions etc. could prolong process).